Algebra Contracting has successfully completed a comprehensive renovation of the master bathroom at Rimal 2, JBR. The project encompassed an extensive range of work, from demolition to final touches. This included removal works, electrical and plumbing upgrades, installation of niches, ceiling work, an access panel, and spotlights. The WC wall was renovated, the floor was raised, and waterproofing measures were implemented. The room was then enhanced with new wall and floor tiles, a floor trap, a wall cabinet, a drawer unit, and a storage unit. A stone sink unit was installed, along with a dual mixer wash basin set, a WC set, a shower set, and various accessories. The space was then finished with a mirror and a glass shower panel, culminating in a completely transformed master bathroom.